Electrical Installation of Basketball Court at A Kung Kok Fisherman Village Shatin - Iu Cheong Electric Company Limited

    You Are Currently Here!
  • Home
  • PortfolioElectrical Installation of Basketball Court at A Kung Kok Fisherman Village Shatin

Project Information

  • Project Title: Electrical Installation of Basketball Court at A Kung Kok Fisherman Village Shatin
  • Client: Leisure and Cultural Services Department
  • Contract Period: 04-2010 to 01-2011

Electrical Installation of Basketball Court at A Kung Kok Fisherman Village Shatin

Project Overview:
Iu Cheong Electric Company Limited was contracted by the Leisure and Cultural Services Department to carry out an electrical installation project for a basketball court at A Kung Kok Fisherman Village Shatin. The project was completed between April 2010 and January 2011. The scope of work included the supply, installation, testing, and commissioning of the main, sub-main, outgoing power distribution systems, general lighting, landscape lighting, earthing, and equipotent bonding systems.

Scope of Work:
The scope of work for this electrical installation project included the following systems:

Section A – Main, sub-main, Outgoing Power Distribution Systems:
The main, sub-main, and outgoing power distribution systems were designed and installed by Iu Cheong Electric Company Limited. The project team ensured that the systems were installed in compliance with the relevant electrical codes and standards.

Section B – General Lighting and Landscape Lighting:
The general lighting and landscape lighting were designed and installed to provide sufficient illumination for the basketball court. The lighting system was energy-efficient and complied with the relevant standards.

Section C – Earthing and Equipotent Bonding Systems:
The earthing and equipotent bonding systems were installed to ensure the safety of the basketball court users. The systems were designed and installed to comply with the relevant electrical codes and standards.

Challenges and Solutions:
One of the main challenges faced by Iu Cheong Electric Company Limited during this project was the tight schedule. The project had to be completed within a short period of time to meet the client’s deadline. To overcome this challenge, the project team worked around the clock to ensure that the project was completed on time.

Results and Achievements:
The electrical installation project for the basketball court at A Kung Kok Fisherman Village Shatin was completed successfully within the given timeframe and budget. The systems installed by Iu Cheong Electric Company Limited were designed to meet the client’s requirements and comply with the relevant electrical codes and standards. The project was well-received by the client, and the basketball court users were satisfied with the functionality and safety of the electrical systems.

Conclusion:
Iu Cheong Electric Company Limited is proud to have successfully completed the electrical installation project for the basketball court at A Kung Kok Fisherman Village Shatin. The project team’s dedication and expertise ensured that the project was completed on time, within budget, and to the satisfaction of the client and the basketball court users. The company remains committed to delivering high-quality electrical installation projects that meet the needs of its clients.

Project Gallery: